SJC (Southeast Asia-Japan Cable) submarine cable
Price and availability check
The invisible infrastructure of global connectivity
The Southeast Asia-Japan Cable System (SJC) is a high-capacity cable that connects Japan directly with Singapore, Hong Kong, the Philippines, Brunei and China. It was deliberately routed across the Philippine Sea to avoid the earthquake-prone zones north of the Philippines. The route is considered one of the most resilient intra-Asian connections. With six fiber pairs and 28 Tbit/s capacity, SJC offers a direct low-latency connection between Japan and the Southeast Asian region. At the Japanese landing point Chikura, SJC is directly connected to the transatlantic Unity cable, which enables particularly low latencies on the Singapore-Los Angeles route
Route & connection
SJC connects Chikura (Japan) with Shantou (China), Chung Hom Kok (Hong Kong), Nasugbu/Batangas (Philippines), Telisai (Brunei) and Tuas (Singapore) as well as an optional extension to Songkhla (Thailand). The basic configuration comprises seven cable landing stations in six countries. The system length is 8,900 kilometers (with Thailand extension up to 10,700 km).
>20%
Savings
99,99%
Availability
24/7
Support
Awards for Outstanding Performance
SJC at a glance
What is the SJC cable?
SJC (Southeast Asia-Japan Cable) is an intra-Asian submarine cable connecting Chikura in Japan with Shantou (China), Chung Hom Kok (Hong Kong), Nasugbu (Philippines), Telisai (Brunei) and Tuas (Singapore), with an optional extension to Songkhla in Thailand. The cable spans 8,900 kilometers and entered service on June 27, 2013. Across six fiber pairs, SJC reaches a design capacity of 28 Tbit/s. It was jointly built by TE SubCom and NEC, and is funded and operated by a broad consortium comprising Globe Telecom, Google, KDDI, Telkom Indonesia, SingTel, China Telecom, TOT, China Mobile, Chunghwa Telecom (via subsidiary Donghwa Telecom) and Brunei International Gateway (BIG). The deliberate routing across the Philippine Sea avoids seismically active zones, making SJC one of the most resilient intra-Asian connections.
SJC fact sheet
| Attribute | Detail |
|---|---|
| Full name | Southeast Asia-Japan Cable (SJC) |
| Route | Japan (Chikura), China (Shantou), Hong Kong (Chung Hom Kok), Philippines (Nasugbu), Brunei (Telisai), Singapore (Tuas); optional Thailand (Songkhla) |
| Length | 8,900 kilometers (with Thailand extension up to 10,700 km) |
| Ready for service | June 27, 2013 |
| Design capacity | 28 Tbit/s |
| Fiber pairs | 6 |
| Technology | 40G SLTE (later upgraded to 100G), OADM branching technology |
| Manufacturer | TE SubCom and NEC jointly |
| Operating consortium | Globe Telecom, Google, KDDI, Telkom Indonesia, SingTel, China Telecom, TOT, China Mobile, Chunghwa Telecom, Brunei International Gateway |
| Distinguishing feature | direct connection to the Unity cable in Chikura for the lowest available Singapore-Los Angeles latency |
SJC submarine cable

Technology & capacity
SJC was jointly supplied by TE SubCom and NEC Corporation and has six fiber pairs with OADM branching technology.
- 6 fiber pairs: 28 Tbit/s design capacity after 100G upgrade of SLTE equipment
- OADM technology: Optical add-drop multiplexing at the branch points for flexible capacity allocation
- Earthquake-proof routing: deliberate routing away from seismically active zones
- Direct Unity connection in Chikura: Lowest available latency on the Singapore-Los Angeles route
Provider Overview
SAVECALL as access to SJC
SJC is the first choice for companies that want to connect Japan, Hong Kong and the ASEAN region via a resilient, low-latency system. The earthquake-resistant routing and direct Unity connection in Chikura make SJC technically the most compelling option for latency-sensitive applications on this axis. SAVECALL has direct partnerships with the relevant consortium partners and sources capacity on SJC without detours. We compare the available options on SJC, APG and SJC2 and recommend the combination that suits your site mix and redundancy requirements. This is not standard advice. This is market access.
The result for our customers:
- Direct capacity access to SJC without reseller chains
- Negotiation of IRU structures and leased capacity models
- Transparent price benchmarking against all available alternatives
- True route diversity through independent redundancy planning
- Clear SLAs and ongoing capacity management

SJC compared
In the intra-Asian cable market, SJC competes with newer, higher-capacity systems based on more modern technology. For procurement decisions, what matters most is whether a proven, decade-plus route with a track record of reliability is needed, or whether higher raw capacity takes priority. The comparison below positions SJC against APG, which serves a similar North Asia-Southeast Asia route, and SJC2, its direct successor system.
| Criterion | SJC | APG | SJC2 |
|---|---|---|---|
| Route | Japan, China, Hong Kong, Philippines, Brunei, Singapore, optional Thailand | Japan, South Korea, China, Taiwan, Hong Kong, Vietnam, Thailand, Malaysia, Singapore | Singapore, Hong Kong, Japan plus further Asia-Pacific landing points |
| Design capacity | 28 Tbit/s | 54.8 Tbit/s | 126 Tbit/s |
| In service since | 2013 | 2016 | partially active since 2025 |
| Fiber pairs | 6 | 6 | 7 |
| Ownership model | Consortium of 10 companies, including Google, KDDI, China Mobile | Consortium with twelve international members, including Meta, NTT, China Mobile | Consortium, built by NEC |
| Strength | earthquake-resistant route, direct Unity connectivity for lowest US latency | central backbone system for North Asia-Southeast Asia traffic, 20 times the capacity of its predecessor | currently the highest capacity of the three systems, latest wavelength technology |
Vendor-neutral assessment: SAVECALL does not rank SJC, APG and SJC2 against each other, but views them as complementary building blocks for resilient intra-Asian connectivity. Which cable or combination makes sense for a business depends on the required site mix in Japan, China, Southeast Asia or beyond, and existing carrier relationships. As a carrier-neutral consultancy, we source capacity across all relevant systems and recommend purely based on actual requirements.
Related submarine cables and cluster pages
- Direct neighbor in the same intra-Asia cluster: APG submarine cable
- All submarine cable capacities at a glance: Submarine cable hub
- WAN connectivity and redundancy concepts for businesses: WAN cluster
Customers
Why
Telecom & IT sourcing. Worldwide. Carrier-independent.
Selection & operation of worldwide connectivity & cloud infrastructure. Without vendor risk & unnecessary costs.
- 80+ carriers worldwide
- One point of contact
- One SLA
- One portal: mySAVECALL
- Min. 20% savings
25+
years of experience
40+
Employees
80+
Partner
1400+ Clients
Trusted Advisor for IT & Telecommunications Sourcing
What drives you forward – & what drives
Book a free expert consultation
Frequently asked questions about the SJC cable
SJC connects Chikura in Japan with Shantou in China, Chung Hom Kok in Hong Kong, Nasugbu in the Philippines, Telisai in Brunei and Tuas in Singapore, with an optional extension to Songkhla in Thailand. For companies with sites in Japan, Hong Kong or the ASEAN region, SJC offers one of the longest-established, most resilient intra-Asian routes.
SJC reaches a design capacity of 28 Tbit/s, spread across six fiber pairs. This is not among the highest capacities in its region, but SJC stands out for its earthquake-resistant routing and direct connectivity to the Unity cable for low US latency.
SJC entered service on June 27, 2013, and was jointly built by TE SubCom and NEC. It is operated by a consortium of ten telecommunications and technology companies, including Google, KDDI, China Mobile, China Telecom and SingTel.
This mainly depends on the landing points and capacity you need. SJC is a good fit for a proven, earthquake-resistant route with direct US connectivity via Unity, APG offers broader North Asia-Southeast Asia coverage with higher capacity, and SJC2 currently provides the highest capacity of the three systems. Combining systems is often the better choice to ensure genuine redundancy. SAVECALL advises on the right combination on a vendor-neutral basis.
Genuine redundancy only exists when the chosen cables use different landing points and physically separate routes, for example combining SJC with APG or SJC2. Since all three systems connect some of the same countries, companies should carefully examine the actual physical routing and landing stations used. SAVECALL plans these concepts independently of any single cable operator, with a focus on actual failover reliability.
Access to capacity on SJC runs through direct wholesale partnerships with the consortium partners, as well as IRU or leased capacity agreements. SAVECALL negotiates these structures directly with the relevant carriers, without detours via reseller chains. Book a free consultation to discuss the right capacity solution for your business.