The AAE-1 (Asia Africa Europe 1) submarine cable is one of the longest submarine cable systems in the world, connecting Asia, the Middle East and Europe on a single continuous route. With landing points in over a dozen countries along the route, AAE-1 is a central backbone of digital connectivity between three continents, tapping into some of the fastest growing digital markets in the world. Submarine cables like AAE-1 form the invisible foundation of global data traffic, with over 99% of international data flowing through them rather than through satellites or the cloud.
Route & connection
AAE-1 connects Hong Kong and Vietnam in the east with France and Greece in the west, passing through the South China Sea, the Indian Ocean, the Persian Gulf and the Red Sea to the Mediterranean. Along the route, the cable lands in Malaysia, Singapore, India, Pakistan, Oman, Djibouti, Saudi Arabia, Egypt, Greece and France. With a total length of around 25,000 kilometers, AAE-1 is one of the longest submarine cable systems in the world.
>20%
Savings
99,99%
Availability
24/7
Support
Awards for Outstanding Performance
AAE-1 at a glance
What is the AAE-1 cable?
AAE-1 (Asia Africa Europe 1) is a submarine cable spanning around 25,000 kilometers that connects Hong Kong and Vietnam in the east, via Southeast Asia, India, the Middle East and North Africa, with Greece, Italy and France in the west. The cable entered service in June 2017 and reaches a design capacity of at least 40 Tbit/s across five fiber pairs using 100G technology. It was built by SubCom for the France-to-Thailand segment and NEC for the Thailand-to-Hong Kong segment, and is funded and operated by a broad consortium of 18 telecommunications companies, including China Unicom, Etisalat, Mobily, Ooredoo, PCCW, Reliance Jio, Telecom Egypt and Viettel. At launch, AAE-1 was the longest newly built submarine cable in over a decade.
AAE-1 fact sheet
| Attribute | Detail |
|---|---|
| Full name | Asia Africa Europe 1 (AAE-1) |
| Route | Hong Kong, Vietnam, Cambodia, Thailand, Malaysia, Singapore, Myanmar, India, Pakistan, Oman, UAE, Qatar, Yemen, Djibouti, Saudi Arabia, Egypt, Greece, Italy, France |
| Length | around 25,000 kilometers |
| Ready for service | June 2017 |
| Design capacity | at least 40 Tbit/s |
| Fiber pairs | 5 |
| Technology | 100G DWDM, fiber optic |
| Manufacturer | SubCom (France-Thailand), NEC (Thailand-Hong Kong) |
| Operating consortium | 18 companies, including China Unicom, Etisalat, Mobily, Ooredoo, PCCW, Reliance Jio, Telecom Egypt, Viettel |
| Distinguishing feature | first submarine cable to directly connect all major regions of Asia, Africa, the Middle East and Europe |
AAE-1 submarine cable

Technology & capacity
AAE-1 uses state-of-the-art fiber optic technology and offers a capacity of up to 40 Tbit/s, which meets the requirements of international companies with bandwidth needs along the entire Asia-Europe route. Essentially, these are the technological features:
- Multiple fiber pairs: AAE-1 is equipped with multiple fiber pairs that enable scalable capacity planning over the entire route length.
- Over a dozen landing points: The large number of landing points along the route makes AAE-1 one of the most flexible cable systems for connecting markets between Asia and Europe.
- Fibre optic technology with optimized signal amplification for stable transmission quality over the entire cable length of 25,000 kilometers.
Provider Overview
SAVECALL as access to AAE-1
AAE-1 is one of the most versatile and strategically valuable cable systems for companies with a presence along the Asia-Europe route. The combination of numerous landing points in growth markets such as India, Pakistan, Oman and Djibouti with the direct connection to European Internet nodes makes AAE-1 an indispensable building block for global connectivity strategies. At the same time, the length and complexity of the system makes careful route analysis and redundancy planning particularly important, as physical overlaps with other cable systems along the route are common. This is exactly where SAVECALL comes in. We have direct access to the market, analyze your connectivity strategy and source capacities on AAE-1 specifically for your requirements.
The result for our customers:
- Direct capacity access to AAE-1 without reseller chains
- Transparent price benchmarking and market data
- Connecting growth markets in Asia, the Middle East and Europe
- Negotiation of IRU structures and leased capacity models
- Clear SLAs and ongoing capacity management

AAE-1 compared
On the route between Asia, the Middle East, Africa and Europe, AAE-1 competes with significantly newer cable systems based on more modern SDM technology and correspondingly higher capacities. For procurement decisions, what matters most is whether the established, broadly diversified AAE-1 route with its many landing points is needed, or whether higher raw capacity takes priority. The comparison below positions AAE-1 against 2Africa, by far the highest-capacity system on a similar route, and Africa-1, a direct competitor on the Middle East-Europe segment.
| Criterion | AAE-1 | 2Africa | Africa-1 |
|---|---|---|---|
| Route | Hong Kong, Southeast Asia, India, Middle East, Egypt, Greece, Italy, France | United Kingdom, West Africa, South Africa, East Africa, Middle East, India, Pakistan, Spain, Italy | France to the Middle East via several African countries |
| Design capacity | at least 40 Tbit/s | 180 Tbit/s | 96 Tbit/s |
| In service since | 2017 | 2023/2024 (core), Pearls extension 2026 | under construction since 2021 |
| Fiber pairs | 5 | 16 | 8 |
| Ownership model | Consortium of 18 telecommunications companies | Consortium (China Mobile, Meta, Bayobab, Orange, stc, Telecom Egypt, Vodafone, WIOCC) | Consortium, built by Alcatel Submarine Networks |
| Strength | very broad country coverage on a single route since 2017 | highest capacity and country coverage, direct interconnection with AAE-1 | additional, physically separate Middle East-Europe route |
Vendor-neutral assessment: SAVECALL does not rank AAE-1, 2Africa and Africa-1 against each other, but views them as complementary building blocks for resilient connectivity between Asia, the Middle East, Africa and Europe. Which cable or combination makes sense for a business depends on the required landing points along the route and existing carrier relationships. As a carrier-neutral consultancy, we source capacity across all relevant systems and recommend purely based on actual requirements.
Related submarine cables and cluster pages
- Thematically related Asia-Europe route: PEACE Cable submarine cable
- All submarine cable capacities at a glance: Submarine cable hub
- WAN connectivity and redundancy concepts for businesses: WAN cluster
Customers
Why
Telecom & IT sourcing. Worldwide. Carrier-independent.
Selection & operation of worldwide connectivity & cloud infrastructure. Without vendor risk & unnecessary costs.
- 80+ carriers worldwide
- One point of contact
- One SLA
- One portal: mySAVECALL
- Min. 20% savings
25+
years of experience
40+
Employees
80+
Partner
1400+ Clients
Trusted Advisor for IT & Telecommunications Sourcing
What drives you forward – & what drives
Book a free expert consultation
Frequently asked questions about the AAE-1 cable
AAE-1 connects Hong Kong, Vietnam, Cambodia and Thailand in the east via Malaysia, Singapore, Myanmar, India, Pakistan and the Middle East with Greece, Italy and France in the west. In total, the cable lands in 19 countries along the route, making it one of the most geographically diverse submarine cable systems in the world.
AAE-1 reaches a design capacity of at least 40 Tbit/s, spread across five fiber pairs using 100G DWDM technology at its 2017 launch. The system has since been upgraded several times, including with Infinera ICE6 technology in 2022, significantly increasing available capacity beyond the original design value.
AAE-1 entered service in June 2017, at which point it was the longest newly built submarine cable in over a decade. It was built by SubCom and NEC, and is funded and operated by a consortium of 18 telecommunications companies from Asia, the Middle East, Africa and Europe.
This mainly depends on the landing points and capacity you need. AAE-1 offers the broadest country coverage on an established route since 2017, 2Africa provides by far the highest capacity and additional African landing points, and Africa-1 offers a physically separate alternative on the Middle East-Europe segment. Combining several systems is often the better choice to ensure genuine redundancy. SAVECALL advises on the right combination on a vendor-neutral basis.
Genuine redundancy only exists when the chosen cables use different landing points, operators and physically separate routes, for example combining AAE-1 with 2Africa or Africa-1. Since several cables on this route pass through similar geographic chokepoints such as the Red Sea or the Persian Gulf, companies should carefully examine the actual physical routing. SAVECALL plans these concepts independently of any single cable operator, with a focus on actual failover reliability.
Access to capacity on AAE-1 runs through direct wholesale partnerships with the consortium partners, as well as IRU or leased capacity agreements. SAVECALL negotiates these structures directly with the relevant carriers, without detours via reseller chains. Book a free consultation to discuss the right capacity solution for your business.